Refinery Health Assessment by PAUT & TOFD
Health assessment of refinery equipment and piping using PAUT and TOFD during the 2024–2025 maintenance and inspection shutdown.
View Project Details →Explore 18 authentic project references covering refinery shutdowns, advanced NDT, tube inspection, drone inspection, rope access, marine load testing, PWHT and regulatory certification.
Filter by sector or search by client, asset, technique or capability.
Health assessment of refinery equipment and piping using PAUT and TOFD during the 2024–2025 maintenance and inspection shutdown.
View Project Details →PAUT and TOFD examination of in-service reactors and piping installed at the refinery.
View Project Details →Electromagnetic acoustic transducer ultrasonic thickness gauging of critical equipment and piping for pre-turnaround assessment.
View Project Details →Advanced nondestructive examination of an aboveground LPG storage bullet.
View Project Details →Internal and external visual inspection of static equipment, including columns, furnaces and stacks, using industrial drones.
View Project Details →Inspection of multiple coal-bunker liners using drone technology during planned shutdowns.
View Project Details →Remote field eddy-current testing of boiler tubes in 660 MW thermal power units.
View Project Details →Eddy-current testing of condenser tubes and low- and high-pressure heater tubes in 210 MW and 500 MW units.
View Project Details →Inspection of high-pressure heater and condenser tubes using acoustic pulse reflectometry during planned unit maintenance.
View Project Details →Phased-array ultrasonic inspection of boiler-tube and piping weld joints during unit overhauling.
View Project Details →Annual-rate contract for inspection and ultrasonic gauging of insulated storage tanks using rope-access methods.
View Project Details →Maintenance of fire-water sprinkler nozzles, sprinkler lines and foam-pourer systems using industrial rope access.
View Project Details →
PROJECT 13 / 18
Marine
Inspection and load testing of upper-deck equipment in accordance with applicable technical requirements.
View Project Details →Testing and certification of lifting tools, tackles and pressure vessels installed at the powerhouse and barrage.
View Project Details →
PROJECT 15 / 18
PWHT & Thermal
Post-weld heat treatment of splitter columns at the BHEL project site.
View Project Details →Multidisciplinary nondestructive-testing services during a scheduled refinery shutdown.
View Project Details →Inspection and certification of pressure vessels in accordance with the applicable factories rules.
View Project Details →Corrosion mapping of water-wall tubes in a 210 MW thermal-power boiler.
View Project Details →Try another search or select All.
PAUT, TOFD, EMAT-UTG, RFET, ECT, APR and corrosion mapping.
Drone inspection and industrial rope-access execution.
Time-critical refinery and power-plant inspection.
Marine load testing, lifting inspection and pressure-vessel certification.
PWHT and controlled heat-treatment capability.
Share the asset, facility, project location, required technique and schedule with IAIS UAE.