Scope
Eddy-current testing of condenser tubes and low- and high-pressure heater tubes in 210 MW and 500 MW units.
Eddy-current testing of condenser tubes and low- and high-pressure heater tubes in 210 MW and 500 MW units.
NTPC Vindhyachal Super Thermal Power Station, India
Power Generation
08 / 18
Eddy-current testing of condenser tubes and low- and high-pressure heater tubes in 210 MW and 500 MW units.
Eddy-current testing of condenser tubes and low- and high-pressure heater tubes in 210 MW and 500 MW units.
This represents large-scale tube-inspection capability applicable to power, desalination, petrochemical and process facilities.