PROJECT 10 · Power Generation

PAUT of Boiler-Tube and Piping Welds

Phased-array ultrasonic inspection of boiler-tube and piping weld joints during unit overhauling.

PAUT of Boiler-Tube and Piping Welds
Project Overview

PAUT of Boiler-Tube and Piping Welds

Client

NTECL Vallur Thermal Power Project, India

Sector

Power Generation

Project Ref.

10 / 18

Phased-array ultrasonic inspection of boiler-tube and piping weld joints during unit overhauling.

Project Scope & Capability

What this project demonstrates

01

Scope

Phased-array ultrasonic inspection of boiler-tube and piping weld joints during unit overhauling.

02

Capabilities

PAUT Boiler Welds Piping Welds Overhaul Support
03

Portfolio relevance

This showcases advanced weld examination in a high-temperature power-plant environment.

Project Enquiry

Need similar support for your facility or asset?